Job Description |
Currently working Drive Test and RF engineer From 1st june to till date.
G Devising new KPIs
· Site integration Drive Test
· KPI Analysis and Management according to SLA
· Problem Resolution and Verification Drive Test
· Cluster Approval Drive Test
· BSC Rehoming / Performance Monitoring:
· Handover Testing (Inter BSC, Inter MSC)
· LAC Update Testing
· SMS, GPRS, Call Setup Testing
· Swap Optimization including:
· Compatibility Analysis and Design
· Integration Process
· KPI Harmonization
Working As PM / CM team lead Engineering Services Jacobabad region from March 2013 to 1st June.
1. To mange customer handle PM schedules move team remove all critical alarms from NOC.
2. Manage office data maintained store record record keeping.
3. Maintain data base as per vender requirements.
4. Maintain check list as per PMCL requirements.
working: As a PM / CM Engineer
Vital Tech: Engineering & services MPM region from Aug 2012 to March 2013 .
1. Ability to handle alarms within short period of time.
2. Perform BSS activities such as off lining BTS Commissioning on both Indoor & Outdoor Alcatel system.
3. Perform TXN activities such as loop testing and troubleshoot if any fault occurs.
4. Ability maintain all sites as per customer requirement.
EPTSC (Egyptian Pakistani Telecommunication Services Company Pvt Ltd.) As a BSS Engineer (South) 05,01, 2012. to Sept 2012
Responsibilties:
ALCATEL –MOBILINK operation & Maintenance, perform BSS, Transmission & On-call activities.
Field Experience:
Installation, commissioning, configuration and troubleshouting of NEC Passolink, NEC & Alcatel-BTS(MBO2E).
ALCATEL-MOBILINK PROJECT:
HANDS ON EXPERIENCE ON ALCATEL BTS (MBO2E)
ALCATEL –MOBILINK operation & Maintenance, perform BSS, Transmission & On-call activities.
POWER:
§1 Any fault whether related to electrical or mechanical are under BSS engineer.
§2 Fault related to External Alarm (fire, rectifiers, intruder, Temperature, Genset).
From JAN 2009 to 2011 WATAN SERVE PAKISTAN (Warid,U.fone,Huawei)Projects
Skills:
•
TRANSMISSION DEPT: (Worked as Team Leader)
·1 Hands on Experience (RTN 600 Series Huawei Equipment)
·2 LOS Site Surveys
·3 Microwave Link Installation and Trouble Shooting
·4 ATP Tests performed with Huawei.
·5 Successful completion of PAT and Pre-PAT activities.
·6 Perform indoor & outdoor installation of Huawei sites.
Indoor Unit Maintenance
·1 Checking the IF board indicators
·2 Checking the service board indicators
·3 Testing the orderwire phone
·4 Cleaning the air filter
·5 Cleaning the equipment room
ODU Maintenance
·1 It is recommend to perform the
operations in every half year or
after a fresh gale.
·2 Checking the ODU
·3 Checking the hybrid coupler
·4 Checking the antenna
·5 Checking the IF cable
·6 ODU
·7 Antenna
·8 IF cable
Checking the Antenna
·1 Protection area of the lightning arrester.
·2 Connections between antenna to pole.
·3 Antenna radome should be intact.
·4 No water accumulation in antenna.
·5 Position and direction of antenna.
BSS DEPARTMENT:
·1 Working as a BSS Engineer in Watan Serve Pvt, Ltd
·2 Installing and Commissioning of Huawei BTS 3012 & 3012AE
·3 Perform indoor & outdoor installation of Huawei sites
·4 Inspecting site as a BSS engineer for quality assurance
·5 Measuring VSWR ,sweep testing of Antenna/Feeder & power tests of BTS through Site Master
·6 Perform site ATP according to customer requirement
·7 Perform snag removal activities
·8 Installation and verification of External alarms in Huawei sites
·9 Troubleshooting of alarms in BTS sites
From Feb 2008 to Dec 2008 IIC TELECOM GROUP LAHORE
BSS/ DEPARTMENT(CMPAK(ZONG) PROJECT)
·1 Commissioning and integration of ZTE BTS,
·2 Installation of complete BTS and RECTFIER.
·3 Troubleshooting of sites.
·4 Measuring of VSWR and DTF and PWR,
·5 Inspecting sites as BSS/ Engineer for quality assurance
·6 CPE testing
·7 PAT and Pre-PAT of sites on CMPAK project.
·8 Installation and verification indoor and outdoor alarms from OMCR.
From Oct 2006 to Jan 2008
3DES ENGGINEERING SYSTEM
·1 LOS Transmission Engineer (Warid Project)
·2 Path LOS, Path Survey, Flash Test, Balloon Test, Eye Test, Map info, Google Map,
·3 GPS and COMPAS uses,
·4
|